Day of arrival
Disassembly in preparation for fiberglass repairs
Frame has been removed and will be replaced with a custom fabricated frame to handle the greatly increased horsepower and performance suspension
Rear deck surround is now bonded in place
Lower fender section w/rocker panels and rear valance are now bonded in
Fiberglass repair to floor is being started
Firewall is being reworked to eliminate heater box and will be completely reglassed to eliminate unwanted holes that will not be needed for Vintage Air A/C system
All body components are temporarily in place to insure correct alignment and clearances
Original body panels repaired
Test fit of windshield
Dynamat installed for heat and noise reduction
First coat of CRE epoxy primer has been applied for block sanding
Corvette was sold at this stage
Comments